Shropshire Star

Shropshire bridge to close for five days due to repair work

A bridge will be shut to allow for workers to carry out repairs.

Published

Shropshire Council said that drivers would not be able to use the B4368 Shipton Bridge for five days from Monday.

The closure will be from 9.30am to 4pm and the work carried out will include taking down and rebuilding the damaged parapet wall.

An alternative route via the B4368, B4378, A458, and B436 will be signposted.